ChinaRecap.
Independent archive
English
中文Español日本語Français
← People & placesPlace

Wuhu 芜湖

Names and data status

Shared activities do not establish personal relationships or affiliations.

Compare this entity →
2026-10-15 — 2026-11-13 · Change filters
Advanced filters
Reset all filters
30/30 days processed · Missing coverage is unknown.
Data & counting

Source archive 2026-10-13 — 2026-11-13

Activities count extracted event records with explicit participation or location links; repeated reports may describe the same real-world activity. Related reports count entity mentions, while keyword search counts text matches. Status labels describe the source report, not a live activity status. Unknown event dates are never replaced by broadcast dates. Counts describe this archive, not public popularity.

Report history 1

Archive total 1

Distinct reports by broadcast date. * Partial coverage; — unknown.

View counts and coverage

Activity filters do not affect these counts. Background mentions are included, and each source story counts once.

PeriodObserved reportsProcessed days
2026-10117/17
2026-11013/13

Latest activities

On October 22, cable stringing for the major Yangtze River crossing of the Gansu-Zhejiang ±800-kilovolt ultra-high-voltage direct-current transmission project began in Wuhu, Anhui. The entire Anhui section is expected to be connected before the end of the month.

View evidence

On October 22, cable stringing for the major Yangtze River crossing of the Gansu-Zhejiang ±800-kilovolt ultra-high-voltage direct-current transmission project began in Wuhu, Anhui. The entire Anhui section is expected to be connected before the end of the month.

Translated paragraph context
Today, October 22, in Wuhu, Anhui, conductor stringing began for the major Yangtze River crossing of the Gansu–Zhejiang ±800-kilovolt ultra-high-voltage direct-current transmission project, a key project in the west-to-east power transmission initiative. The entire Anhui section is expected to be connected before the end of the month. The Gansu–Zhejiang ±800-kilovolt ultra-high-voltage direct-current transmission project passes through six provinces and has a total length of about 2,370 kilometers. Once operational, it will transmit 36 billion kilowatt-hours of electricity annually, more than half of which will be green electricity.
Original Chinese quote
在安徽芜湖,“西电东送”重点工程——甘肃至浙江±800千伏特高压直流输电工程开始了长江大跨越放线工作
Read matching source paragraph →
Source evidence